Healthcare Construction
Sordoni was the General Contractor for this 13,500-square-foot utility plant, already under construction at the Geisinger Wyoming Valley Medical Center located in Plains Township, PA. This facility houses a variety of energy-efficient equipment including cogeneration, electric chillers, boilers, chilled water storage, an emergency generator, underground diesel fuel oil storage tanks and a steam turbine chiller. Our scope of work included the foundation, structure, shell and interior architectural construction. The Central Utility Plan’s design will allow GWV to operate independent of the public power grid should a natural disaster strike.
The project in it’s entirety, including the mechanical and electrical work, was completed by the end of 2019.